Skip to content

[Docs] Post-OP-Stack migration: obsolete references and missing post-deadline guidance #1395

@lau90eth

Description

@lau90eth

Summary

Following Base's exit from Optimism's OP Stack (Feb 2026) and the April 9 migration deadline for Farcaster mini-apps, I found several docs inconsistencies.

Issues Found

  1. Obsolete OP Stack reference in fee docs

    • Page: /base-chain/network-information/network-fees
    • Text links to "op-stack developer documentation"
    • Base now runs the unified base/base stack
  2. Missing post-deadline guidance in migration guide

    • Page: /apps/quickstart/migrate-to-standard-web-app
    • Deadline was April 9, 2026
    • No section explaining what happens to unmigrated apps (grace period? hard stop? error messages?)
  3. README base/node still claims "built on Optimism's OP Stack"

    • Should reflect the unified stack architecture
  4. README base/contracts says "utilizes Optimism's bedrock contracts"

    • Needs clarification post-migration

Suggested Fixes

  • Update fee docs to reference Base's own fee mechanics or clarify OP Stack heritage
  • Add "Post-April 9" FAQ to migration guide
  • Update base/node and base/contracts READMEs to reflect current architecture

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions