Build: Bump pyarrow from 22.0.0 to 23.0.1 #39
python-ci.yml
on: pull_request
integration-test
26s
integration-test-s3
22s
integration-test-adls
23s
integration-test-gcs
23s
Matrix: lint-and-unit-test
integration-coverage-report
0s
Annotations
11 errors
|
integration-test-s3
Process completed with exit code 2.
|
|
lint-and-unit-test (3.10)
Process completed with exit code 2.
|
|
integration-test-adls
Process completed with exit code 2.
|
|
lint-and-unit-test (3.11)
The strategy configuration was canceled because "lint-and-unit-test._3_10" failed
|
|
lint-and-unit-test (3.11)
Process completed with exit code 2.
|
|
integration-test-gcs
Process completed with exit code 2.
|
|
lint-and-unit-test (3.12)
The strategy configuration was canceled because "lint-and-unit-test._3_10" failed
|
|
lint-and-unit-test (3.12)
Process completed with exit code 2.
|
|
integration-test
Process completed with exit code 2.
|
|
lint-and-unit-test (3.13)
The strategy configuration was canceled because "lint-and-unit-test._3_10" failed
|
|
lint-and-unit-test (3.13)
The operation was canceled.
|